Ethiopia completes final filling of Grand Ethiopian Renaissance Dam

On Sunday, Ethiopian prime minister Abiy Ahmed (pictured above) announced that the fourth and final filling of the Grand Ethiopian Renaissance Dam (GERD) was complete in a move that was immediately denounced by Egypt as a violation of international law.

The two countries have been engaged in a long-running dispute over the dam, which Ethiopia says is vital for its power needs but Egypt fears could limit its access to Nile waters. The Nile contributes 90% of Egypt’s fresh water and underpins its irrigation and power generation.

The latest friction comes despite hopes of a diplomatic breakthrough sparked in July when Abiy Ahmed and Egypt’s President Abdel Fattah al-Sisi said they planned to resume negotiations over the dam and complete them within four months.


Powered by: C.B.N